[more pictures]
Pipeline Replacement
-Erie, PA
Approximately 12 700ft sections of 12" pipe was replaced. Including 5 stream crossings, 3 road, and 2 railroad crossings. The work also required the removal of the existing pipe.
Services Provided
- Clearing and grubbing
- Pipe stringing
- Pipe installation
- Road/RR boring
- Hydrostatic testing
- Restoration